精品国产一区二区三区蜜殿,亚洲欧美日韩在线另类,欧美黄色麻豆,久久肉色丝袜美女

Online Service
Scan it
Support hotline
18681482740
Service Hotline:
18681482740
中文  |   English
News
Contact

Address: Floor 1, Building 2, Quanshengchang Industrial Park, Buyong Shajing Road, Shajing Street, Shenzhen

Contact: Mr. Li 18681482740

Email: lilinhan1314@126.com

Website: www.suyuchun.cn

News
Metal stamping lower mold and demolding production
04-04 / 2023

Metal stamping lower mold and demolding production


The mold for metal stamping generally consists of four parts: mold base, upper mold base, lower mold base, and stripper plate. In order to reduce work cycles and enhance the accuracy of stamping molds produced, manufacturers will imitate the techniques of excellent operators to reduce the occurrence of abnormal errors in mold production


1. The template lowered during production floats onto the pin hole, and R0.1 is poured and polished below.


2. Remove the burrs on the front of all frame openings of the template without chamfering, and chamfer C0.2 on the back.


3. Reverse R1.0 and polish the front side of the auxiliary guide pillar hole on the lower plate, and reverse R0.5 and polish the back side.


4. Lower board Φ Pour R1.0 on both sides of the 12.000 positioning hole and polish it.


5. Invert R0.5 and polish the discharge direction of the front frame opening of the fan-shaped adjustment station.


6. Lower cushion plate Φ Pour R1.0 on both sides of the 12.06 positioning hole and polish it.


7. Invert R0.2 and polish the front and back of the tapping holes on the lower mold pad.


8. Clean the inner holes of the two boards with kerosene.


9. Place the moving parts on the lower board to confirm if they can be moved up and down.


10. Reconfirm the flange size of the auxiliary guide sleeve.


11. Tap the auxiliary guide sleeve into place from the back of the lower plate. (Note: only for non adhesive tight fitting)


12 Φ Drive in the 12.000 positioning pin from the front of the lower template and extend the straight line approximately 10.0mm from the back.


13. Use M6 screws to connect the lower base plate and lower template.


14. Insert the knife edge pad. (Pay attention to directionality and avoid blocking the cutting process)


15. Shenzhen Hardware Stamping Production Knock-in Blanking Knife Edge Insertion Block. (Check if there are any chipping angles on the cutting edge. The cutting edge surface can be 0.000~0.005mm higher than the mold surface and not lower than the mold surface)


Links:Zibo CNC machine tool automatic car washing machine Qingdao refrigeration equipment grinder equipment steel grit fire inspection cabinet sweeper motor desulfurization denitrification equipment drawing mold washing machine automatic soldering machine server repair HART475 hand operator dust-free cloth dust-free paper stack screw type Sludge dehydration machine, precision repair welding machine, Shandong motor repair, rotary hot pot equipment, integrated ultrasonic cleaning machine, Zhongjie radial drilling machine, beer equipment, Shenzhen brass manufacturer, welcome lamp, lens digging, drilling rig, aluminum housing manufacturer, automatic dispensing machine, automatic screwing machine neodymium Iron boron magnet 4g router wireless bridge
We provide you with high quality products
粗大挺进尤物人妻中文字幕| 欧美精品国产专区91在线| 少妇丰满大乳被男人揉捏视频| 久久久久久一区二区三区| 日韩欧美一区二区三区永久免费| 欧美一区二区三区久久综合| 四虎www成人影院观看| 精品无码人妻一区二区三区不卡| 成人免费无码大片a毛片久久| 久久久一级片| 女人高潮喷www| 亚洲美女一区二区三区| 亚洲精品国产精品99久久| 亚洲另类一二三区| 卡一卡2卡3卡精品网站| 久久这里只精品国产免费99热4| 国产自产V一区二区三区C| 男女夜色爽爽影院| 日韩精品无码成人专区| 青青草原综合久久大伊人 | 天堂av网站| 精品999日本久久久影院| 国产肥熟女视频一区二区三区 | 国产自拍在线| 小草视频| 四虎影视大全| 人妻体内射精一区二区| 亚洲.国产.欧美一区二区三区| 99噜噜噜在线播放| 亚洲AV无码成人精品区一区| 国产午夜无码片在线观看网站| 撕开奶罩揉吮奶头高潮av| 国产精品久久久久9999吃药| 99久久精品免费观看国产 | 欧美激情区| a级毛片免费观看完整| 久久婷婷综合激情亚洲狠狠 | AV无码久久久久不卡蜜桃| 99国产精品久久久久久久成人| 国产欧美va欧美va香蕉在线 | 日日夜夜精品免费|