精品国产一区二区三区蜜殿,亚洲欧美日韩在线另类,欧美黄色麻豆,久久肉色丝袜美女

Online Service
Scan it
Support hotline
18681482740
Service Hotline:
18681482740
中文  |   English
Industry knowledge
Contact

Address: Floor 1, Building 2, Quanshengchang Industrial Park, Buyong Shajing Road, Shajing Street, Shenzhen

Contact: Mr. Li 18681482740

Email: lilinhan1314@126.com

Website: www.suyuchun.cn

Industry knowledge
Assembly of upper mold seat for precision stamping molds
07-19 / 2024

In order to shorten the processing cycle of stamping molds, enhance mold accuracy, unify the methods of operators, reduce anomalies that may occur during mold production, ensure production quality and mold life, the following explanation is given to the assembly process of the upper mold seat of the stamping mold.




The assembly of the upper die seat of the stamping mold is completed in the following 10 steps:




1. Splint Φ 12.000 positioning holes and auxiliary guide pillar holes, with a circumferential chamfer of R1.0 and polished




2. Use a 600 # oilstone or diamond file to remove burrs from the frame opening.




3. Use 600 #~1000 # oilstones to flatten both sides of the template and remove any burrs.




4. Use kerosene and alcohol to clean the mold surface and inner holes.




5. Install the auxiliary guide set into the same template.




6. Place the clamping part of the punch into the template frame and check if the punch is smoothly removed and placed. (Do not put the punch in after it is closed to avoid accidentally breaking the small punch)




7. Fix the punch with a pressure plate. (Note that the pressure plate should not be too close to the punch to avoid interference with the punch.) After fixing the punch, there should be a small amount of movement space to facilitate the natural alignment of the punch.




8. Gently close the detachment plate and the detachment back plate together into the clamp plate, and check if there is any interference in the positioning of the detachment back plate's pressing plate. When fully closed, there should be no gap between the detachment back plate and the clamp plate.




9. After joining, the cutting punch should exceed the pressing surface by more than 0.8mm (minus material thickness).




10. Insert the adjustment rod and upper mold adjustment punch, and rotate the screw until the adjustment punch approaches the effective height.






Through the above 10 steps, the assembly of the upper mold seat of the stamping mold has been completed.






Licao Precision is an ODM/OEM professional manufacturer specializing in the design and manufacturing of precision stamping molds and precision hardware stamping.


Links:Zibo CNC machine tool automatic car washing machine Qingdao refrigeration equipment grinder equipment steel grit fire inspection cabinet sweeper motor desulfurization denitrification equipment drawing mold washing machine automatic soldering machine server repair HART475 hand operator dust-free cloth dust-free paper stack screw type Sludge dehydration machine, precision repair welding machine, Shandong motor repair, rotary hot pot equipment, integrated ultrasonic cleaning machine, Zhongjie radial drilling machine, beer equipment, Shenzhen brass manufacturer, welcome lamp, lens digging, drilling rig, aluminum housing manufacturer, automatic dispensing machine, automatic screwing machine neodymium Iron boron magnet 4g router wireless bridge
We provide you with high quality products
波多野结av衣东京热无码专区| 四虎成人精品国产永久免费| 亚洲男人的天堂一区二区| 丰满岳乱妇在线观看中字| 777av| 国产制服91一区二区三区制服| 久久无码人妻丰满熟妇区毛片| 欧美性大战XXXXX久久久√| 亚洲精品少妇| 日日夜夜精品免费| 国产AV夜夜欢一区二区三区| 55大东北熟女啪啪嗷嗷叫| 又大又湿又紧又爽a视频| h视频在线观看免费| 亚洲色图50p| 久久久久久影院| 人成午夜免费视频在线观看| 高清视频大片免费观看| 亚洲中文字幕无码AV| 777亚洲熟妇色xxxxx| 97毛片| 在线天堂av| 中文国产成人精品久久| 丰满少妇被猛烈进入试看| YYY6080韩国三级理论| 亚洲日韩精品无码专区网站| 欧美精品一区| 日日夜夜撸| 亚洲九九爱| 国产探花在线精品一区二区亚洲 | 丰满少妇女人a毛片视频| 欧美又大粗又爽又黄大片视频| a狠狠久久蜜臀婷色中文网| 牛牛在线视频| 国产精品99久久久久久| 欧美日韩成人| 天天舔天天射| 亚洲区欧美区| 亚洲无吗| 国产成人综合亚洲AV第一页| 人妻被按摩师玩弄到潮喷|